Consolidated Water Co Wins $39.8M Contract from City of Pismo Beach, California
Consolidated Water's subsidiary, PERC Water Corporation, entered into a $39.8 million design-build agreement with the City of Pismo Beach for the Central Coast Blue Advanced Water Purification Facility. The project involves designing and constructing a drought-resistant water supply system using ultrafiltration and reverse osmosis, with substantial completion expected by September 2028.
- Value
- $39.8M
- Counterparty
- City of Pismo Beach, California
- Term
- 703 calendar days
“This award reflects the strength of our advanced water-treatment capabilities and our ability to compete successfully for technically sophisticated design-build projects. We are proud that PERC Water was selected following a rigorous competitive evaluation, and we look forward to supporting the City of Pismo Beach as it advances a reliable, locally controlled, and drought-resistant water supply.”
Rick McTaggart, Consolidated Water CEO